03.07.2017

Crane control for overhead crane

Operator's crane cabin for overhead crane - production time is 8 weeks!

 

 Depending on the complexity of the products manufactured and the timing of delivery of components, the production period is usually no more than 8 weeks
A special feature of this project is the operator's chair with prepared holes in the columns for the installation of joysticks and electrical control devices for the crane, made specially for our customer.

 

 

 

 

 


Please if there are any points not clear to you, feel free to contact us.

Also please call or This email address is being protected from spambots. You need JavaScript enabled to view it.us and make an appointment for a personal introduction with our equipments in factory because we always have crane cabins, container and operator's seats in stock!